Close Navigation ×
Perch Base Event Photos

Upcoming Events

Eternal Patrol

The "MidWatch"
Arizona's Silent Service Memorial

Arizona's Silent Service Memorial.

Meeting Minutes

Videos

Perch Base Officers

Base Awards

Links

About Perch Base

USS Perch War Patrols

Flash Traffic

SubVet Application

Eagle Scout Program

Base Newsletters

Policies/Procedures

Useful Base
Documents and Forms.

Docs & Forms
Board of Dir. Login
☰ Nav Menu
Click on our Perch Base logo to return to the home page

ASSM
Construction

USSVI logo

Click on the logo or these words to go to the United States Submariners home page.

At long last construction of the Arizona Silent Service Memorial (ASSM) is finally underway. The trapezoidal base and surfacing submarine modules are being built off site and will be transported to the memorial site for installation and finishing when the construction site at Wesley Bolin Plaza is ready.

The ASSM Foundation Committee had a site meeting with Sunland Asphalt & Const., and, Neil Urban from the Arizona Department of Administration (ADOA) on January 24, 2020. We reviewed our site plans which are 95% complete and Neil provided us some excellent feedback and we should be able to fine‑tune our final plans and submit them to the state within the next two weeks. Once this is done, Neil said they should be able to turn it around and give us approval within two weeks. As soon as the ADOA gives us their approval, we want to have a Groundbreaking Ceremony. We must apply for a permit for this and all future events, which all need to be approved by the ADOA. All bureaucratic red tape but very necessary for the process.

In our site meeting with Neil Urban, we were informed that we will have very limited access to the memorial site when the State Legislature is in session. We can have access only on nights and weekends. Our construction timeline will be 4-6 weeks. The legislative session ends in late spring or early summer at which time we will complete construction. Our Dedication Ceremony will most likely be pushed back to fall to avoid the intense summer heat. We will keep you updated accordingly.
We are still seeking funding for the memorial construction and subsequent activities. Our Memorial Pavers will be installed at the end of the construction process, so please continue to reach out to your friends, relatives and business associates and let them know about our project. Memorial Pavers are a great way to honor friends and loved ones. We will be announcing a "Construction Special" for Memorial Pavers on the ASSM website at: www.arizonasilentservicememorial.org.
If you have already purchased a Memorial Paver or have funded one of our ASSM sponsorship items, you will receive another update. Tim Moore has a Donor’s List he uses to send out ASSM progress updates. If you have not purchased a Memorial Paver, now is the time to do it. We would like all Perch Base members to participate in building this memorial that honors all submariners. We would definitely love to add all your names to our donor’s list. Don’t miss out!

Click on any thumbnail for a larger picture.

ASSM construction photos

(l-r) Attending the 01/24/2020 meeting, standing on the location of the future ASSM Memorial:
Brian Petko, Petko Const.; Dan Marks, Perch Base Webmaster; Joe Stevens Sunland Structures General Manager; Tim Moore, ASSM Chairman; Renee Palmer-Stevens, ASSM Designer; Kevin Fisher, Sunland Asphalt & Const. Project Manager; Marcus Hensley, ASSM Treasurer; Chris Urness, ASSM Secretary; Nate Decker, ASSM Copper Sculptor.

ASSM construction photos

Form for the construction pad. 01/23/2020

ASSM construction photos

Concrete pad & starting walls for trapezoidal base. 01/25/2020

ASSM construction photos

Further progress on the trapezoidal base. 01/27/2020

ASSM construction photos

01/28/2020.

ASSM construction photos

01/28/2020.

ASSM construction photos

01/29/2020

ASSM construction photos

01/29/2020.

ASSM construction photos

01/29/2020.

ASSM construction photos

01/29/2020

ASSM construction photos

01/30/2020.

ASSM construction photos

01/30/2020.

ASSM construction photos

01/30/2020.

ASSM construction photos

02/03/2020.

ASSM construction photos

02/04/2020.

ASSM construction photos

02/04/2020.

ASSM construction photos

02/04/2020.

ASSM construction photos

02/04/2020. At Castle Steel.

ASSM construction photos

02/04/2020. At Castle Steel.

ASSM construction photos

02/04/2020. At Castle Steel.

ASSM construction photos

02/04/2020. At Castle Steel.

ASSM construction photos

At Castle Steel. 02/06/2020.

ASSM construction photos

At Castle Steel. 02/06/2020.

ASSM construction photos

At Castle Steel. 02/06/2020.

ASSM construction photos

02/07/2020. The trapezoid base is expected to load and ship to Nate Decker's shop (the sculptor) on Tuesday, 2/11/2020 to place the boat on top and do the copper work.

ASSM construction photos

02/11/2020. On the move.

ASSM construction photos

02/11/2020. On the move.

ASSM construction photos

02/11/2020. On the move.

ASSM construction photos

02/11/2020. On the move.

ASSM construction photos

02/11/2020. On the move.

ASSM construction photos

02/11/2020. On the move. Just as an FYI, the trapezoid base structure weighs 33,500 lbs. (We believe it weighs the same submerged.)

ASSM construction photos

02/11/2020. On the move.

ASSM construction photos

02/11/2020. On the move.

ASSM construction photos

02/12/2020. At Castle Steel.

ASSM construction photos

02/12/2020. At Castle Steel.

ASSM construction photos

02/13/2020. At Castle Steel.

ASSM construction photos

02/13/2020. At Castle Steel.

ASSM construction photos

02/13/2020. At Castle Steel.

ASSM construction photos

03/04/2020.

ASSM construction photos

03/04/2020.

ASSM construction photos

03/04/2020.

ASSM construction photos

03/04/2020. Phase 2 complete. Phase 3 will be wrapping the structure with our copper sculpture.

ASSM construction photos

03/06/2020.

ASSM construction photos

03/06/2020.

ASSM construction photos

03/06/2020.

ASSM construction photos

03/09/2020.

UPDATE: 06/05/2020
ASSM One (Major) Step Closer!
The Arizona Silent Service Memorial completed an important step toward reality. The Arizona Department of Administration, the Arizona Historical Advisory Commission, and State of Arizona approved the engineering and code reviews submitted earlier this year.
The next step will be to have a construction planning meeting in the near future to put together a construction timeline. Previous discussions with the State of Arizona determined that placement at Wesley Bolin Plaza in front of the Capital Building would only be permitted while the State House and Senate are out of session. The Legislature adjourned on May 26 for the remainder of the year, which should permit construction to start anytime soon and might be completed in time to dedicate the Memorial near Veterans Day.

View the Approval Letter

View the Approval Letter

ASSM construction photos

06/18/2020: Now that the ASSM is fully approved, work on the monument is again underway, beginning Phase 3. Concrete is being "floated" in to create the formation of the water.

ASSM construction photos

06/18/2020.

ASSM construction photos

06/18/2020.

ASSM construction photos

06/23/2020. The copper sculptor Nate Decker getting started.

ASSM construction photos

06/23/2020. Test samples of the paint that will be on the retaining wall of the overlook platform.

ASSM construction photos

06/23/2020.

ASSM construction photos

07/18/2020. Copper cladding installed on the walls of the memorial.

ASSM construction photos

07/23/2020. Sculpture is about 75% complete. Sculpture work should be completed in the next few days if the weather cooperates. This is going to be awesome when completed!

ASSM construction photos

07/23/2020.

ASSM construction photos

07/23/2020.

ASSM construction photos

07/23/2020.

ASSM construction photos

08/03/2020. Groundbreaking Ceremony. Read more and see more pictures and video on the Groundbreaking Ceremony webpage HERE.

ASSM construction photos

08/06/2020. Significant earthmoving completed and the location where the retaining wall will be is now evident.

ASSM construction photos

08/06/2020.

ASSM construction photos

08/06/2020.

ASSM construction photos

08/06/2020. The trench for the retaining wall foundation is done and the rebar for the foundation pour is almost ready for inspection. North end of the retaining wall foundation.

ASSM construction photos

08/06/2020.

ASSM construction photos

08/06/2020. West side of the retaining wall foundation. This is where the viewing platform will be when the wall is completed.

ASSM construction photos

08/06/2020. South end of the retaining wall foundation.

ASSM construction photos

08/10/2020. Retaining wall foundation footing concrete poured.

ASSM construction photos

08/10/2020. Retaining wall foundation footing concrete poured.

ASSM construction photos

08/10/2020. Retaining wall foundation footing concrete poured.

ASSM construction photos

08/10/2020. Retaining wall foundation footing concrete poured.

ASSM construction photos

08/11/2020. Blocks for the retaining wall have been delivered.

ASSM construction photos

08/11/2020. The Lost Boat blocks being delivered.

ASSM construction photos

08/11/2020. The Lost Boat blocks being delivered.

ASSM construction photos

08/11/2020. An example of one of the Lost Boat blocks.

ASSM construction photos

08/12/2020. Perch Base members on hand to ensure the Lost Boat blocks are laid in the correct order. (l-r) Joe Trotter, Marcus Hensley, Marcia Unser, Don Unser.

ASSM construction photos

08/12/2020. Perch Base members on hand to ensure the Lost Boat blocks are laid in the correct order. (l-r) Dan Marks, Don Unser.

ASSM construction photos

08/12/2020. Perch Base members on hand to ensure the Lost Boat blocks are laid in the correct order. (l-r) Mike Olsen, Marcus Hensley.

ASSM construction photos

08/12/2020. Perch Base members on hand to ensure the Lost Boat blocks are laid in the correct order. (l-r) Don DeMarte, Mike Olsen.

ASSM construction photos

08/12/2020. Get ready. Get set...

ASSM construction photos

08/12/2020. Go! The first block of the retaining wall is laid.

ASSM construction photos

08/12/2020.

ASSM construction photos

08/12/2020. The first Lost Boat block (USS Perch) being laid in the lowest course.

ASSM construction photos

08/12/2020. The bottom course of 5 Lost Boat blocks laid: (l-r) USS Perch, Pickerel, Pompano, R-12, Robalo.

ASSM construction photos

08/13/2020. The middle course of 5 Lost Boat blocks laid: (l-r) USS Albacore, Amberjack, Argonaut, Barbel, Bonefish.

ASSM construction photos

08/13/2020. The middle course of 5 Lost Boat blocks laid: (l-r) USS Darter, Dorado, Escolar, F-1, F-4.

ASSM construction photos

08/13/2020. The middle course of 5 Lost Boat blocks laid: (l-r) USS Grenadier, Growler, Grunion, Gudgeon, Harder.

ASSM construction photos

08/13/2020. The middle course of 5 Lost Boat blocks laid: (l-r) USS S-28, S-36, S-39, S-44, S-51.

ASSM construction photos

08/13/2020. The middle course of 5 Lost Boat blocks laid: (l-r) USS Seawolf H-1 SS-28, Seawolf SS-197, Shark SS-174, Shark SS-314, Snook SS-279.

ASSM construction photos

08/13/2020. The middle course of 5 Lost Boat blocks laid: (l-r) USS Trigger, Triton, Trout, Tullibee, Wahoo.

ASSM construction photos

08/13/2020. The upper course of 5 Lost Boat blocks laid: (l-r) USS Bullhead, Capelin, Cisco, Cochino, Corvina.

ASSM construction photos

08/13/2020. The upper course of 5 Lost Boat blocks laid: (l-r) USS Flier, Golet, Grampus, Grayback, Grayling.

ASSM construction photos

08/13/2020. The upper course of 5 Lost Boat blocks laid: (l-r) USS Herring, Kete, Lagarto, O-5, O-9.

ASSM construction photos

08/13/2020. The upper course of 5 Lost Boat blocks laid: (l-r) USS Runner, S-4, S-5, S-26, S-27.

ASSM construction photos

08/13/2020. The upper course of 5 Lost Boat blocks laid: (l-r) USS Scamp, Scorpion SS-278, Scorpion SSN-589, Sculpin, Sealion.

ASSM construction photos

08/13/2020. The upper course of 5 Lost Boat blocks laid: (l-r) USS Squalus, Stickleback, Swordfish, Tang, Thresher.

ASSM construction photos

08/13/2020. Yours truly (Dan Marks, Perch Base Webmaster) helping the expert brickmasons get the Lost Boat blocks in the correct order.

ASSM construction photos

08/13/2020. Three Perch Base members (l-r) Marcus Hensley, Don Unser, Dan Marks "supervising" that the Lost Boat blocks go in the right place. There were 3 expert brickmasons, so I think we got the leader/worker ratio just about right for a job on state property, even if it is being done by Sunland Construction, a private company!

ASSM construction photos

08/14/2020. The retaining wall is completed.

ASSM construction photos

08/14/2020. The retaining wall is completed.

ASSM construction photos

08/14/2020. The retaining wall is completed.

ASSM construction photos

08/17/2020. Not a lot of obvious progress, but they have been busy! All the channels in the masonry block wall have been filled with concrete to make it a solid structure (not to mention the vertical rebar and horizontal rebar that was placed every two courses during placement.) The drainpipe is also visible along the fence.

ASSM construction photos

08/17/2020. The masonry finishing caps have been delivered and ready to be installed tomorrow.

ASSM construction photos

08/17/2020. The waterproofing has been applied to the backside to ready it for dirt backfill. After backfill up to the waterproofing, the drainpipe will be installed and the remainder of the backfill will be gravel substrate for the walkway to the observation area.

ASSM construction photos

08/18/2020. The masonry finishing caps have been installed.

ASSM construction photos

08/20/2020. Clearing out the area for leveling and Memorial foundation.

ASSM construction photos

08/20/2020. The dirt backfill.

ASSM construction photos

08/20/2020. The gravel substrate for the walkway to the observation area.

ASSM construction photos

08/21/2020. The Memorial at copper artist Nate Decker's studio, The Bloc Project, in Anthem, AZ. The classic blue patina, like the AZ Capital Building dome, and numerous coats of sealant will be added in the next several days.

ASSM construction photos

08/21/2020. The Memorial at copper artist Nate Decker's studio, The Bloc Project, in Anthem, AZ. The classic blue patina, like the AZ Capital Building dome, and numerous coats of sealant will be added in the next several days.

ASSM construction photos

08/21/2020. The Memorial at copper artist Nate Decker's studio, The Bloc Project, in Anthem, AZ. The classic blue patina, like the AZ Capital Building dome, and numerous coats of sealant will be added in the next several days.

ASSM construction photos

08/21/2020. The Memorial at copper artist Nate Decker's studio, The Bloc Project, in Anthem, AZ. The classic blue patina, like the AZ Capital Building dome, and numerous coats of sealant will be added in the next several days.

ASSM construction photos

08/21/2020. The Memorial at copper artist Nate Decker's studio, The Bloc Project, in Anthem, AZ. The classic blue patina, like the AZ Capital Building dome, and numerous coats of sealant will be added in the next several days.

ASSM construction photos

08/21/2020. Gold & silver dolphins to be mounted on the Memorial at copper artist Nate Decker's studio, The Bloc Project, in Anthem, AZ.

ASSM construction photos

08/21/2020. Gold & silver dolphins to be mounted on the Memorial at copper artist Nate Decker's studio, The Bloc Project, in Anthem, AZ.

ASSM construction photos

08/21/2020. Plaques to be mounted in the vicinity of the Memorial, currently at copper artist Nate Decker's studio, The Bloc Project, in Anthem, AZ.

ASSM construction photos

08/21/2020. Plaques to be mounted in the vicinity of the Memorial, currently at copper artist Nate Decker's studio, The Bloc Project, in Anthem, AZ.

ASSM construction photos

08/21/2020. Plaques to be mounted in the vicinity of the Memorial, currently at copper artist Nate Decker's studio, The Bloc Project, in Anthem, AZ.

ASSM construction photos

08/21/2020. Plaques to be mounted in the vicinity of the Memorial, currently at copper artist Nate Decker's studio, The Bloc Project, in Anthem, AZ.

ASSM construction photos

08/21/2020. Plaques to be mounted in the vicinity of the Memorial, currently at copper artist Nate Decker's studio, The Bloc Project, in Anthem, AZ.

ASSM construction photos

08/21/2020. Starting to apply the blue patina. Photo courtesy of Don Unser.

ASSM construction photos

08/24/2020. Blue patina applied. Note the whitewater from the emergency blow broaching. Photo courtesy of Marcus Hensley.

ASSM construction photos

08/24/2020. Blue patina applied. Note the whitewater from the emergency blow broaching. Photo courtesy of Marcus Hensley.

ASSM construction photos

08/24/2020. Blue patina applied. Photo courtesy of Marcus Hensley.

ASSM construction photos

08/24/2020. Continued clearing out the area for leveling and Memorial foundation.

ASSM construction photos

08/24/2020. The painting of the wall is in progress. The blue used on the bottom half of the Arizona flag (and the red rays, when completed) are the same shades as the United States flag. The yellow (and red, when completed) rays symbolize Arizona's picturesque landscape. The Lost Boat engraving seen in earlier photos has been temporarily masked over during painting.

ASSM construction photos

08/24/2020. Continued preparation for the walkway to the observation area behind the retaining wall.

ASSM construction photos

08/24/2020. Backfill completed at the observation area behind the retaining wall.

ASSM construction photos

08/26/2020. The painting of the front side of the wall is almost completed. The blue used on the bottom half of the Arizona flag and the red rays are the same shades as the United States flag. The yellow and red rays symbolize Arizona's picturesque landscape. The only painting remaining is the center star that signifies copper production (Arizona produces more copper than any other state in the country). Most of the Lost Boat engraving seen in earlier photos has been temporarily masked over during painting.

ASSM construction photos

08/26/2020. The Memorial area is leveled out.

ASSM construction photos

08/26/2020. The concrete forms for the walkway to the observation area are in place.

ASSM construction photos

08/26/2020. The concrete forms for the walkway to the observation area are in place.

ASSM construction photos

08/26/2020. The concrete forms for the walkway to the observation area are in place.

ASSM construction photos

08/26/2020. The "landing zone" for the Memorial is identified.

UPDATE: 08/27/2020
SET THE MANEUVERING WATCH!
UNDERWAY ON DIESEL POWER!
The Arizona Silent Service Memorial was transported from Nate Decker's studio, The Bloc Project, in Anthem, AZ to its permanent location at Wesley Bolin Memorial Plaza on Thursday, August 27, 2020.
The final construction steps, including placing the pavers is expected to be completed over the next couple weeks.
The official dedication ceremony will be April 17, 2021, but it will be open to the public as soon as it is completed.
Television channel AZFamily 3 was present for the lift in Anthem, AZ. As long as it remains available, the video can be viewed HERE
And another from television channel Fox 10 HERE
And a link to an article in the Daily Independent

Click on any thumbnail for a larger picture.

ASSM construction photos

08/27/2020. Various views of the Memorial prior to loading at Nate Decker's studio, The Bloc Project, in Anthem, AZ.

ASSM construction photos

08/27/2020. Various views of the Memorial prior to loading at Nate Decker's studio, The Bloc Project, in Anthem, AZ.

ASSM construction photos

08/27/2020. Various views of the Memorial prior to loading at Nate Decker's studio, The Bloc Project, in Anthem, AZ.

ASSM construction photos

08/27/2020. Various views of the Memorial prior to loading at Nate Decker's studio, The Bloc Project, in Anthem, AZ.

ASSM construction photos

08/27/2020. Various views of the Memorial prior to loading at Nate Decker's studio, The Bloc Project, in Anthem, AZ.

ASSM construction photos

08/27/2020. Various views of the Memorial prior to loading at Nate Decker's studio, The Bloc Project, in Anthem, AZ.

ASSM construction photos

08/27/2020. Various views of the Memorial prior to loading at Nate Decker's studio, The Bloc Project, in Anthem, AZ.

ASSM construction photos

08/27/2020. Various views of the Memorial prior to loading at Nate Decker's studio, The Bloc Project, in Anthem, AZ.

ASSM construction photos

08/27/2020. The Arizona Silent Service Memorial Artist and Designer, Renee Palmer-Jones Stevens.

ASSM construction photos

08/27/2020. The Arizona Silent Service Memorial Artist and Designer, Renee Palmer-Jones Stevens being interviewed on-air by Phoenix TV Channel 3.

ASSM construction photos

08/27/2020. Sunland Asphalt & Construction employee, Kevin, being interviewed on-air by Phoenix TV Channel 3.

ASSM construction photos

08/27/2020. The crane and trailer that will be used to transport the Memorial to Wesley Bolin Memorial Plaza.

ASSM construction photos

08/27/2020. Station the MANEUVERING WATCH. The 32,000 pound crane pick begins.

ASSM construction photos

08/27/2020. As a boat parts the last line from the pier to get underway, we SHIFT COLORS. The Memorial gets underway!

ASSM construction photos

08/27/2020.

ASSM construction photos

08/27/2020.

ASSM construction photos

08/27/2020. The Memorial is secured on the trailer for the trip to Wesley Bolin Memorial Plaza. On the Usta‑Fish, we would "stow for sea" and then perform "Angles & Dangles" to verify that we didn't overlook anything.

ASSM construction photos

08/27/2020. On the morning of 17 January 1955, at 11 am EST, Nautilus' first Commanding Officer, Commander Eugene P. Wilkinson, ordered all lines cast off and signaled the memorable and historic message, "Underway on Nuclear Power."
Since the tractor trailer is a diesel, and some of our members are DBF sailors, we will declare that the ASSM is "Underway on Diesel Power."
Photo courtesy of Marcus Hensley.

ASSM construction photos

08/27/2020. "Underway on Diesel Power."

ASSM construction photos

08/27/2020. "Underway on Diesel Power."

ASSM construction photos

08/27/2020. "Underway on Diesel Power."

ASSM construction photos

08/27/2020. "Underway on Diesel Power."

ASSM construction photos

08/27/2020. Memorial arrives at Wesley Bolin Memorial Plaza.

ASSM construction photos

08/27/2020. The copper star on the retaining wall is now done.
Photo courtesy of Jerry Allston.

ASSM construction photos

08/27/2020. The Memorial is ready for the pick off the trailer.

ASSM construction photos

08/27/2020. Before the pick, ASSM Co-Chairman gave a brief presentation, mostly honoring Tim Moore's accomplishments.

ASSM construction photos

08/27/2020. Before the pick, ASSM Co-Chairman gave a brief presentation, mostly honoring Tim Moore's accomplishments.

ASSM construction photos

08/27/2020. If you look closely, Marcus is holding Tim Moore's Eternal Patrol Certificate, which will be placed inside the Memorial as part of a "time capsule."

ASSM construction photos

08/27/2020. ASSM Co-Chairman Marcus Hensley, ASSM Co-Chairman Chris Urness, and ASSM Civil Engineer Jim Martin place items for the "time capsule."

ASSM construction photos

08/27/2020. Photo courtesy of Jerry Allston.

ASSM construction photos

08/27/2020. Various attendees, mostly Perch Base members, came to watch the Memorial being installed.
Photo courtesy of Marcus Hensley.

ASSM construction photos

08/27/2020. Various attendees, mostly Perch Base members, came to watch the Memorial being installed.

ASSM construction photos

08/27/2020. The crane pick begins.

ASSM construction photos

08/27/2020. Sunland Construction employees guide the Memorial to its permanent home.
Photo courtesy of Jerry Allston.

ASSM construction photos

08/27/2020. When Neil Armstrong landed on the moon for the first time alongside Buzz Aldrin, he said, "The Eagle has landed," to tell NASA Mission Control Center that the pair had made a safe trip to the moon on July 20, 1969.

ASSM construction photos

08/27/2020. Observers applaud the accomplishment.

ASSM construction photos

08/27/2020. The ship is MOORED, Secure the MANEUVERING WATCH.

View the Sailing List for the Monument move to Wesley Bolin Memorial Plaza.

View the Sailing List
ASSM construction photos

09/02/2020. Concrete around the Monument has been poured. Note the slight drop from the access walkway to the slab. This is the height of the pavers that will be installed. Also note the holes that will contain the stantions with the anchor chain around the Monument.

ASSM construction photos

09/03/2020. Stantions for the anchor chain have been installed around the Monument.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/03/2020. Walkway to the observation deck has been poured.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/03/2020. Walkway to the observation deck has been poured.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/03/2020. Walkway to the observation deck has been poured.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/03/2020. Walkway to the observation deck has been poured.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/08/2020. Perch Base members sorting the pavers prior to installation.

ASSM construction photos

09/08/2020. Perch Base members sorting the pavers prior to installation. (l-r) Dan Marks, Chris Urness, Howard Doyle, Mike Olsen, Marcus Hensley, Jerry Allston, John Carpentier, Joe Trotter.

ASSM construction photos

09/08/2020. Perch Base members sorting the pavers prior to installation. (l-r) Chris Urness, John Carpentier, Jerry Allston, Marcus Hensley, Joe Trotter, Howard Doyle, Mike Olsen.

ASSM construction photos

09/08/2020. Perch Base members sorting the pavers prior to installation. (l-r) Jerry Allston, Marion Cartland, John Carpentier, Joe Trotter, Howard Doyle.

ASSM construction photos

09/08/2020. Perch Base member Mike Olsen sorting the pavers prior to installation.

ASSM construction photos

09/08/2020. Perch Base members sorting the pavers prior to installation. (l-r) Joe Trotter, Marion Cartland, John Carpentier.

ASSM construction photos

09/08/2020. The structure for the some of the plaques being built.

ASSM construction photos

09/09/2020. Work crew started before dawn to beat the heat.

ASSM construction photos

09/09/2020. The first course of paver bricks laid. Perch Base member Joe Trotter counting the pavers to find the centerline to ensure symmetry as the pavers are placed.

ASSM construction photos

09/09/2020. Perch Base members (l-r) Joe Trotter and Don DeMarte on hand to ensure pavers are placed in the correct order.

ASSM construction photos

09/09/2020. Handrails to the observation deck in progress.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/09/2020. Handrails to the observation deck in progress.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/09/2020. Handrails to the observation deck in progress.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/09/2020. Progress laying the pavers.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/09/2020. Pavers installed at the end of the first day. Includes the pavers from our international donors.

ASSM construction photos

09/10/2020. All the straight sections of the handrails to the observation deck are completed. Anyone have an exhaust pipe bender I can borrow?

ASSM construction photos

09/10/2020. All the straight sections of the handrails to the observation deck are completed. Anyone have an exhaust pipe bender I can borrow?

ASSM construction photos

09/10/2020. All the straight sections of the handrails to the observation deck are completed. Anyone have an exhaust pipe bender I can borrow?

ASSM construction photos

09/10/2020. Paver installation is about 2/3 complete, starting at the front of the Monument and extending counter-clockwise around the back.

ASSM construction photos

09/10/2020. Paver installation is about 2/3 complete, starting at the front of the Monument and extending counter-clockwise around the back.

ASSM construction photos

09/10/2020. Paver installation is about 2/3 complete, starting at the front of the Monument and extending counter-clockwise around the back.

ASSM construction photos

09/11/2020. Lost Boat pavers being installed under their respective blocks in the retaining wall.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/11/2020. Closer view of some of the Lost Boat pavers installed under their respective blocks in the retaining wall.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/11/2020. Cutting paver blocks to fill in the gaps. Almost done!.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/14/2020. The structure for the some of the plaques is completed and two plaques installed.

ASSM construction photos

09/14/2020. Another one of the plaques installed at the observation deck.

ASSM construction photos

09/14/2020. Benches in place.

 

ASSM construction photos

09/14/2020. Benches in place.

ASSM construction photos

09/14/2020. Lost Boat pavers installed underneath their respective bricks in the retaining wall. These photos were taken in clockwise order, so they are in alphabetical order.

ASSM construction photos

09/14/2020. Lost Boat pavers installed underneath their respective bricks in the retaining wall. These photos were taken in clockwise order, so they are in alphabetical order.

ASSM construction photos

09/14/2020. Lost Boat pavers installed underneath their respective bricks in the retaining wall. These photos were taken in clockwise order, so they are in alphabetical order.

ASSM construction photos

09/14/2020. Lost Boat pavers installed underneath their respective bricks in the retaining wall. These photos were taken in clockwise order, so they are in alphabetical order.

ASSM construction photos

09/14/2020. Lost Boat pavers installed underneath their respective bricks in the retaining wall. These photos were taken in clockwise order, so they are in alphabetical order.

ASSM construction photos

09/14/2020. Lost Boat pavers installed underneath their respective bricks in the retaining wall. These photos were taken in clockwise order, so they are in alphabetical order.

ASSM construction photos

09/14/2020. Lost Boat pavers installed underneath their respective bricks in the retaining wall. These photos were taken in clockwise order, so they are in alphabetical order.

ASSM construction photos

09/14/2020. Lost Boat pavers installed underneath their respective bricks in the retaining wall. These photos were taken in clockwise order, so they are in alphabetical order.

ASSM construction photos

09/14/2020. Lost Boat pavers installed underneath their respective bricks in the retaining wall. These photos were taken in clockwise order, so they are in alphabetical order.

ASSM construction photos

09/14/2020. Lost Boat pavers installed underneath their respective bricks in the retaining wall. These photos were taken in clockwise order, so they are in alphabetical order.

ASSM construction photos

09/14/2020. Lost Boat pavers installed underneath their respective bricks in the retaining wall. These photos were taken in clockwise order, so they are in alphabetical order.

ASSM construction photos

09/14/2020. Lost Boat pavers installed underneath their respective bricks in the retaining wall. These photos were taken in clockwise order, so they are in alphabetical order.

ASSM construction photos

09/14/2020. Lost Boat pavers installed underneath their respective bricks in the retaining wall. These photos were taken in clockwise order, so they are in alphabetical order.

ASSM construction photos

09/14/2020. Pavers from international donors.

ASSM construction photos

09/14/2020. Pavers recognizing the Perch Base Commanders.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/14/2020. Donated pavers around the Monument, starting at the northeast corner and following around counter clockwise to the southeast corner, including overlap between photos.

ASSM construction photos

09/18/2020. Curved segments of handrails to observation deck being installed.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/18/2020. Curved segments of handrails to observation deck being installed.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/18/2020. Chains being installed.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/18/2020. Landscaping moving along.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/18/2020. Landscaping moving along.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/18/2020. Landscaping moving along.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/21/2020. More finishing touches. All the paver cutting is complete to fill in the gaps. The sand has been spread to lock the pavers in place. The chain around the monument is completed.

ASSM construction photos

09/21/2020. More finishing touches. All the paver cutting is complete to fill in the gaps. The sand has been spread to lock the pavers in place. The chain around the monument is completed.

 

ASSM construction photos

09/21/2020. More finishing touches. All the paver cutting is complete to fill in the gaps. The sand has been spread to lock the pavers in place. The chain around the monument is completed.

ASSM construction photos

09/21/2020. Handrails to the observation deck are almost done. Just one rung of the curved railing is left to finish.

ASSM construction photos

09/21/2020. Handrails to the observation deck are almost done. Just one rung of the curved railing is left to finish.

ASSM construction photos

09/23/2020. Handrails to the observation deck are done.

ASSM construction photos

09/23/2020. The plaques along the walkway to the observation deck are installed.

ASSM construction photos

09/23/2020. The plaques along the walkway to the observation deck are installed.

ASSM construction photos

09/23/2020. Handrails to the observation deck are done.

ASSM construction photos

09/23/2020. The plaques along the walkway to the observation deck are installed.

ASSM construction photos

09/23/2020. The plaques along the walkway to the observation deck are installed.

ASSM construction photos

09/23/2020. The first piece of sod is placed.

ASSM construction photos

09/23/2020. And by the end of the day almost all the sod is in place.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/23/2020. ASSM Artist Nate Decker is putting finishing touches of paint on the wall.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/23/2020. ASSM Artist Nate Decker is putting finishing touches of paint on the wall.
Photo courtesy of Marcus Hensley.

ASSM construction photos

09/23/2020. ASSM Artist Nate Decker is putting finishing touches of paint on the wall.

ASSM construction photos

09/23/2020. ASSM Artist Nate Decker is putting finishing touches of paint on the wall.

Return Home

QUESTIONS OR COMMENTS FOR THE WEBMASTER?  EMAIL [email protected]